Umiejętności
Amtech
Catia
Dialux
Projekt elektryczny
ETAP
Microsoft Excel
Microsoft Word
Turbo Pascal
Elektronika
Hevacomp
Języki
angielski
dobry
niemiecki
podstawowy
Doświadczenie zawodowe
Assistant Electrical Engineer
URS and AECOM have joined together as a one company.
Professional Experience:
[United Kingdom] FARNHAM SIDING 17 – FORM A & FORM B DESIGN. The scope of works includes preparation of specification and the design of: points heating, lighting and buffer stop light for new siding. 2014
[United Kingdom] WEST EALING PROJECT
Preparation of Form A (Preliminary) design. The scope of works include the preparation of the specification and the design of: Controlled Emission Toilet (CET) system, lighting, points heating and power supply for: telecom equipment, maintenance building and low voltage services alongside the walkways. Client: Network Rail. 2015 - on going
[United Kingdom] ILKESTON STATION REDESIGN
Preparation of Form B (Detailed) design. The project included the design of power supply for Ticket Vending Machines (TVMs), Customer Information Systems (CISs), Passenger Help Points (PHPs), telecom equipments and lighting. The lighting design included the utilisation areas like: car parks, walkways, footbridge, platforms, access ramps to the platforms and access roads.
Client: Network Rail. 2015
Professional Experience:
[United Kingdom] FARNHAM SIDING 17 – FORM A & FORM B DESIGN. The scope of works includes preparation of specification and the design of: points heating, lighting and buffer stop light for new siding. 2014
[United Kingdom] WEST EALING PROJECT
Preparation of Form A (Preliminary) design. The scope of works include the preparation of the specification and the design of: Controlled Emission Toilet (CET) system, lighting, points heating and power supply for: telecom equipment, maintenance building and low voltage services alongside the walkways. Client: Network Rail. 2015 - on going
[United Kingdom] ILKESTON STATION REDESIGN
Preparation of Form B (Detailed) design. The project included the design of power supply for Ticket Vending Machines (TVMs), Customer Information Systems (CISs), Passenger Help Points (PHPs), telecom equipments and lighting. The lighting design included the utilisation areas like: car parks, walkways, footbridge, platforms, access ramps to the platforms and access roads.
Client: Network Rail. 2015
Assistant Electrical Engineer
URS Infrastructure & Environment UK Ltd.
URS and AECOM have joined together as a one company.
Profesional Experience:
[United Kingdom] CHILTERN EAST TO WEST PROJECT
Preparation of Form B (Detailed) design for Signalling Power Supply (SPS). The project included the preparation of schematics, power distribution plans, layouts and feeder block diagrams for Gavray Junction and Oxford Parkway Power Supply Points (PSP’s). Preparation of double line diagram and specification for Functional Supply Point (FSP). Short circuit currents and voltage drop analysis in ETAP. Client: Network Rail. 2014
[United Kingdom] EASTLEIGH - SOUTH YARD REMODELLING
Preparation of Form B (Detailed) design. The project included the design of power supply: for maintenance building, dust suppression system, lighting and points heating; the design of water supply system and preparation of lighting calculation in Dialux.
Client: Network Rail. 2014
Profesional Experience:
[United Kingdom] CHILTERN EAST TO WEST PROJECT
Preparation of Form B (Detailed) design for Signalling Power Supply (SPS). The project included the preparation of schematics, power distribution plans, layouts and feeder block diagrams for Gavray Junction and Oxford Parkway Power Supply Points (PSP’s). Preparation of double line diagram and specification for Functional Supply Point (FSP). Short circuit currents and voltage drop analysis in ETAP. Client: Network Rail. 2014
[United Kingdom] EASTLEIGH - SOUTH YARD REMODELLING
Preparation of Form B (Detailed) design. The project included the design of power supply: for maintenance building, dust suppression system, lighting and points heating; the design of water supply system and preparation of lighting calculation in Dialux.
Client: Network Rail. 2014
Power Supply Engineer
Technical documentation preparation, technical drawings preparation, assistance traction substations design, traction power network planning, illumination at the railway stations design, interbranch consultations.
Professional experience:
MACEDONIAN RAILWAY CORRIDOR VIII FROM KICEVO TO ALBANIAN BORDER. Assistance in preparation of financial proposal. January 2013 - ongoing.
REHABILITATION OF MACHIPANDA RAILWAY LINE -MOZAMBIQUE. Assistance in preparation of financial proposal. December 2013 - January 2014.
CABLE REDIRECTINON PROJECT IN COPENHAGEN (Cityring ARL. Enterpiece L27). Main tasks: preparation of drawings before and after rewiring, preparation of documents ready with the drawings. Client: Metroselskabet I/S, Metrovej 5 ,2300 Kobenhavn S. September 2013 – December 2014.
Professional experience:
MACEDONIAN RAILWAY CORRIDOR VIII FROM KICEVO TO ALBANIAN BORDER. Assistance in preparation of financial proposal. January 2013 - ongoing.
REHABILITATION OF MACHIPANDA RAILWAY LINE -MOZAMBIQUE. Assistance in preparation of financial proposal. December 2013 - January 2014.
CABLE REDIRECTINON PROJECT IN COPENHAGEN (Cityring ARL. Enterpiece L27). Main tasks: preparation of drawings before and after rewiring, preparation of documents ready with the drawings. Client: Metroselskabet I/S, Metrovej 5 ,2300 Kobenhavn S. September 2013 – December 2014.
Electrical Assistant Designer
Assistance in technical documentation preparation, technical drawings preparation, assistance traction substations design, traction power network planning, illumination at the railway stations design, interbranch consultations.
Professional experience:
POWER SUPPLY AND CONTROL FOR THE SUBMERSIBLE WELL PUMP. Power Supply Engineer. Participation in preparation of detailed design of power and control for the submersible well pump located 5 km from Cedynia copper rolling mill. Client: Polska Miedz S.A - Cedynia Copper Rolling Mill. March 2013
KRAKÓW – RZESZÓW. Power Supply Engineer. Modernization of E30/C-E30 railway line, section Kraków – Rzeszów from km 24,100 to km 27,300 (Szarow – Kłaj rail route). Preparation of detailed design for modernization. The project included the design of: power supply, catenary wires, point heaters, switchgear cabinets, lighting planning (for turnouts, platforms, subways), street lighting cabinets, etc. Client: Polish State Railways. 2011-2012
KRAKÓW – RZESZÓW. Power Supply Engineer. Modernization of E30/C-E30 railway line, section Kraków – Rzeszów from km 27,300 to km 29,200 (Kłaj station). Preparation of detailed design for modernization. The project included the design of: power supply, catenary wires, point heaters, switchgear cabinets, lighting planning (for turnouts, platforms, subways), street lighting cabinets, etc. Client: Polish State Railways. 2011-2012,
KRAKÓW – RZESZÓW. Power Supply Engineer. Modernization of E30/C-E30 railway line, section Kraków – Rzeszów from km 29,200 to km 36,200 (Kłaj – Bochnia rail route). Preparation of detailed design for modernization. The project included the design of: power supply, catenary wires, point heaters, switchgear cabinets, lighting planning (for turnouts, platforms, subways), street lighting cabinets, etc. Client: Polish State Railways. 2011-2012
KRAKÓW – RZESZÓW. Power Supply Engineer. Modernization of E30/C-E30 railway line, section Kraków – Rzeszów from km 36,200 to km 39,900 (Klaj Station) Preparation of detailed design for modernization. The project included the design of power supply, catenary wires, point heaters, switchgear cabinets, lighting planning (for turnouts, platforms, subways), street lighting cabinets, etc. Client: Polish State Railways. 2011-2012
Professional experience:
POWER SUPPLY AND CONTROL FOR THE SUBMERSIBLE WELL PUMP. Power Supply Engineer. Participation in preparation of detailed design of power and control for the submersible well pump located 5 km from Cedynia copper rolling mill. Client: Polska Miedz S.A - Cedynia Copper Rolling Mill. March 2013
KRAKÓW – RZESZÓW. Power Supply Engineer. Modernization of E30/C-E30 railway line, section Kraków – Rzeszów from km 24,100 to km 27,300 (Szarow – Kłaj rail route). Preparation of detailed design for modernization. The project included the design of: power supply, catenary wires, point heaters, switchgear cabinets, lighting planning (for turnouts, platforms, subways), street lighting cabinets, etc. Client: Polish State Railways. 2011-2012
KRAKÓW – RZESZÓW. Power Supply Engineer. Modernization of E30/C-E30 railway line, section Kraków – Rzeszów from km 27,300 to km 29,200 (Kłaj station). Preparation of detailed design for modernization. The project included the design of: power supply, catenary wires, point heaters, switchgear cabinets, lighting planning (for turnouts, platforms, subways), street lighting cabinets, etc. Client: Polish State Railways. 2011-2012,
KRAKÓW – RZESZÓW. Power Supply Engineer. Modernization of E30/C-E30 railway line, section Kraków – Rzeszów from km 29,200 to km 36,200 (Kłaj – Bochnia rail route). Preparation of detailed design for modernization. The project included the design of: power supply, catenary wires, point heaters, switchgear cabinets, lighting planning (for turnouts, platforms, subways), street lighting cabinets, etc. Client: Polish State Railways. 2011-2012
KRAKÓW – RZESZÓW. Power Supply Engineer. Modernization of E30/C-E30 railway line, section Kraków – Rzeszów from km 36,200 to km 39,900 (Klaj Station) Preparation of detailed design for modernization. The project included the design of power supply, catenary wires, point heaters, switchgear cabinets, lighting planning (for turnouts, platforms, subways), street lighting cabinets, etc. Client: Polish State Railways. 2011-2012
Szkolenia i kursy
- SEP,
- Theben KNX and LUXOR Building Control Systems training
- Theben KNX and LUXOR Building Control Systems training
Specjalizacje
Budownictwo
Architektura/Projektowanie
Budownictwo
Energetyczne
Budownictwo
Instalacje
Zainteresowania
Music, travels, computer programming, running, swimming, tennis, football
Organizacje
2008 - Member of AK SEP(Academic Association SEP)
2007 - 2011 Member of SKT (Student Tourist Club)
2007 - 2011 Member of SNS Strimer (Student Scientific Association Strimer)
2007 - 2011 Member of SKT (Student Tourist Club)
2007 - 2011 Member of SNS Strimer (Student Scientific Association Strimer)
Inne
Knowledge of computers:Microsoft Word, Excel, Autocad, Microstation, Catia, Dialux, Hevacomp, Etap
Programming: Pascal, Matlab, HTML, PHP, CSS
Driving license: Category B
SEP license: Exploitation of Electrical Equipment
Programming: Pascal, Matlab, HTML, PHP, CSS
Driving license: Category B
SEP license: Exploitation of Electrical Equipment
Grupy
Polacy za granicą
Grupa dla osób, które mieszkają, pracują, studiują lub mają inny kontakt z zagranicą. Teraz, kiedyś lub w planach.
Wymiana informacji, porady, carpooling, couchsurfing i inne.